Substation Scout

Gibson City South substation interconnection queue

2 active projects totaling 270 MW in the MISO queue.

2 MISO queue filings name Gibson City South as the point of interconnection, all in IL.

2active projects
270active MW
2total filed
Queue IDProjectkVMWResourceStatus
S1040 Surplus; J734 n/r 135 Hybrid Active
S1041 Surplus; J33/J734 n/r 135 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first