Genpower Keo substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3 MISO queue filings name Genpower Keo as the point of interconnection, all in Lonoke County, AR.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1991 Not reported 500 200 Solar Withdrawn
J2007 Not reported 500 150 Battery Withdrawn
J1992 Not reported 500 110 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.