Queue IDProjectkVMWResourceStatus
J928 Not reported 138 80 Wind Operational
J592 Not reported 138 48.3 Wind Withdrawn
J557 Not reported 138 0.9 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.