Substation Scout

Gallagher-Tittabawassee Transmission Line substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4 MISO queue filings name Gallagher-Tittabawassee Transmission Line as the point of interconnection, all in Bay County, MI.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1909 Not reported 345 200 Solar Withdrawn
J1910 Not reported 345 200 Solar Withdrawn
J2487 Not reported 345 200 Solar Withdrawn
J2933 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first