Substation Scout

Gainesville Switching Station substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Gainesville Switching Station as the point of interconnection, all in Greene County, AR.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2298 Not reported n/r 200 Solar Active
J3578 Not reported n/r 100 Solar Withdrawn
J2300 Not reported n/r 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first