Substation Scout

Francisco - Toyota substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Francisco - Toyota as the point of interconnection, all in Gibson County, IN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1950 Not reported 138 83.2 Solar Withdrawn
J1981 Not reported 138 15 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first