Substation Scout

Forman Substation substation interconnection queue

1 active project totaling 90 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Forman Substation as the point of interconnection, all in Sargent County, ND.

1active projects
90active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3266 Not reported 230 175 Battery Withdrawn
J2094 Not reported 230 100 Battery Withdrawn
J2913 Not reported 115 90 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.