0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Forest Junction Substation as the point of interconnection, all in Calumet County, WI.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1775
Not reported
345
150
Solar
Withdrawn
G977
Not reported
138
101
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.