Ellendale - Twin Brooks substation interconnection queue

1 active project totaling 300 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Ellendale - Twin Brooks as the point of interconnection, all in SD.

1active projects
300active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3468 Not reported 345 300 Hybrid Active
J2333 Not reported 345 200 Wind Withdrawn
J2338 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first