Substation Scout

Ellendale 345 - Twin Brooks substation interconnection queue

2 active projects totaling 400 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name Ellendale 345 - Twin Brooks as the point of interconnection, all in SD.

2active projects
400active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3279 Not reported 345 300 Wind Withdrawn
J1989 Not reported 345 250 Wind Withdrawn
J3420 Not reported 345 200 Wind Active
J3428 Not reported 345 200 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first