Substation Scout

EL DORADO EHV - SAREPTA 345/115 SS substation interconnection queue

3 active projects totaling 722 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4 MISO queue filings name EL DORADO EHV - SAREPTA 345/115 SS as the point of interconnection, all in AR.

3active projects
722active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3889 Not reported 345 350 Solar Active
J2924 Not reported 345 222 Hybrid Active
J3484 Not reported 345 200 Solar Withdrawn
J3888 Not reported 345 150 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first