El Dorado East - Sterlington substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name El Dorado East - Sterlington as the point of interconnection, all in Union County, AR.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1612 Not reported 115 100 Solar Active
J1499 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.