Substation Scout

Edwardsport substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Edwardsport as the point of interconnection, all in Knox County, IN.

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1616 Not reported n/r 200 Solar Active
J2263 Not reported 345 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first