Edwardsport IGCC - Amo substation interconnection queue
3 active projects totaling 460 MW in the MISO queue, plus 5 with terminal status (shown grayed).
8 MISO queue filings name Edwardsport IGCC - Amo as the point of interconnection, all in IN.
3active projects
460active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3113 | Not reported | 345 | 300 | Hybrid | Withdrawn |
| J3810 | Not reported | 345 | 300 | Battery | Withdrawn |
| J3293 | Not reported | 345 | 250 | Solar | Withdrawn |
| J2747 | Not reported | 345 | 160 | Solar | Active |
| J3144 | Not reported | 345 | 150 | Solar | Active |
| J3145 | Not reported | 345 | 150 | Solar | Active |
| J3804 | Not reported | 345 | 100 | Battery | Withdrawn |
| J3813 | Not reported | 345 | 100 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.