Substation Scout

Eau Claire - Arpin substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Eau Claire - Arpin as the point of interconnection, all in Clark County, WI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2018 Not reported 345 190 Solar Withdrawn
J2014 Not reported 345 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first