DUNN - OAK RIDGE (LA) substation interconnection queue

2 active projects totaling 400 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name DUNN - OAK RIDGE (LA) as the point of interconnection, all in LA.

2active projects
400active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2371 Not reported 115 250 Solar Active
J1995 Not reported 115 180 Solar Withdrawn
J2838 Not reported 115 150 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.