Substation Scout

Dubois - Culley line substation interconnection queue

2 active projects totaling 150 MW in the MISO queue.

2 MISO queue filings name Dubois - Culley line as the point of interconnection, all in Dubois County, IN.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1369 Not reported 138 100 Solar Active
S1026 Surplus; J1369 138 50 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first