Duane Arnold substation interconnection queue
3 active projects totaling 1,246 MW in the MISO queue, plus 2 with terminal status (shown grayed).
5 MISO queue filings name Duane Arnold as the point of interconnection, all in IA.
3active projects
1,246active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3932 | Not reported | 161 | 646 | Nuclear | Active |
| R1012 | Replace 15 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold | 161 | 640 | Hybrid | Withdrawn |
| J2268 | Not reported | n/r | 400 | Solar | Active |
| J2545 | Not reported | n/r | 200 | Battery | Active |
| R1042 | Replacing 50 MW of solar generation with BESS; Duane Arnold | 161 | 64 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.