Substation Scout

Duane Arnold substation interconnection queue

3 active projects totaling 1,246 MW in the MISO queue, plus 2 with terminal status (shown grayed).

5 MISO queue filings name Duane Arnold as the point of interconnection, all in IA.

3active projects
1,246active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3932 Not reported 161 646 Nuclear Active
R1012 Replace 15 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold 161 640 Hybrid Withdrawn
J2268 Not reported n/r 400 Solar Active
J2545 Not reported n/r 200 Battery Active
R1042 Replacing 50 MW of solar generation with BESS; Duane Arnold 161 64 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.