DU PONT - WHITE LAKE substation interconnection queue

2 active projects totaling 150 MW in the MISO queue.

2 MISO queue filings name DU PONT - WHITE LAKE as the point of interconnection, all in Muskegon County, MI.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
S1081 Surplus; J1375 138 100 Battery Active
S1082 Surplus; J1587 138 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.