Substation Scout

Driver Substation substation interconnection queue

2 active projects totaling 250 MW in the MISO queue.

2 MISO queue filings name Driver Substation as the point of interconnection, all in Mississippi County, AR.

2active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1155 Not reported 230 150 Solar Active
J1514 Not reported 203 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first