Substation Scout

Derrick substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 3 with terminal status (shown grayed).

4 MISO queue filings name Derrick as the point of interconnection, all in LA.

1active projects
200active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2224 Not reported 230 200 Solar Active
J2210 Not reported 230 100 Battery Withdrawn
J3179 Not reported n/r 100 Solar Withdrawn
J3176 Not reported n/r 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first