Dell to New Madrid line substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Dell to New Madrid line as the point of interconnection, all in Pemiscot County, MO.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3102 Not reported 500 500 Hybrid Withdrawn
J3106 Not reported 500 500 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.