Substation Scout

Deedsville Substation substation interconnection queue

1 active project totaling 292.9 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Deedsville Substation as the point of interconnection, all in Miami County, IN.

1active projects
292.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1743 Not reported 345 292.9 Solar Active
J1150 Not reported 345 30 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first