Dayton Substation substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Dayton Substation as the point of interconnection, all in Wayne County, MI.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2991 Not reported 120 200 Battery Active
J2788 Not reported 120 100 Battery Withdrawn
J206 Not reported 120 25 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.