DATTO substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name DATTO as the point of interconnection, all in Clay County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3617 Not reported n/r 150 Solar Withdrawn
J3618 Not reported n/r 150 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.