Datto-Corning North line substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Datto-Corning North line as the point of interconnection, all in Clay County, AR.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1414
Not reported
161
150
Solar
Withdrawn
J1250
Not reported
161
35
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.