CROSSETT NORTH - HAMBURG substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name CROSSETT NORTH - HAMBURG as the point of interconnection, all in Ashley County, AR.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J3613
Not reported
115
180
Solar
Withdrawn
J3614
Not reported
115
180
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.