Substation Scout

Crookston substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Crookston as the point of interconnection, all in Polk County, MN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1941 Not reported n/r 60 Solar Withdrawn
J1968 Not reported n/r 30 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first