Coyote Switchyard Substation substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4 MISO queue filings name Coyote Switchyard Substation as the point of interconnection, all in Mercer County, ND.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2665 Not reported 345 347 Hybrid Withdrawn
J2883 Not reported 345 347 Hybrid Withdrawn
J2912 Not reported 345 347 Hybrid Withdrawn
J2772 Not reported 345 200 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.