0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Coyote - Green River 100 as the point of interconnection, all in Mercer County, ND.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J081 Not reported 161 200 Wind Withdrawn
J082 Not reported 161 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.