Corning North to Datto Line substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Corning North to Datto Line as the point of interconnection, all in Clay County, AR.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J2984
Not reported
161
150
Solar
Withdrawn
J2996
Not reported
161
50
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.