Cooper - Leesville substation interconnection queue

1 active project totaling 280 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Cooper - Leesville as the point of interconnection, all in LA.

1active projects
280active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3014 Not reported 138 280 Solar Active
J2535 Not reported 138 210 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.