Columbia - Rockdale substation interconnection queue

2 active projects totaling 650 MW in the MISO queue.

2 MISO queue filings name Columbia - Rockdale as the point of interconnection, all in Columbia County, WI.

2active projects
650active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2304 Not reported 345 400 Battery Active
J3639 Not reported 345 250 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.