Substation Scout

Colonial Pipeline - Kentwood Line substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Colonial Pipeline - Kentwood Line as the point of interconnection, all in Pike County, MS.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1223 Not reported 115 150 Solar Withdrawn
J1259 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first