Colonial Pipeline - Kentwood Line substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Colonial Pipeline - Kentwood Line as the point of interconnection, all in Pike County, MS.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1223
Not reported
115
150
Solar
Withdrawn
J1259
Not reported
115
50
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.