Substation Scout

CLEVELAND/SOUTH - STEINER (CE) substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name CLEVELAND/SOUTH - STEINER (CE) as the point of interconnection, all in Sunflower County, MS.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2560 Not reported 115 130 Solar Withdrawn
J2763 Not reported 115 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first