Cincinnati Substation substation interconnection queue

1 active project totaling 198 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Cincinnati Substation as the point of interconnection, all in Tazewell County, IL.

1active projects
198active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2579 Not reported 138 362 Solar Withdrawn
J2575 Not reported 138 198 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.