Substation Scout

Chisholm RD- Hartburg substation interconnection queue

1 active project totaling 300 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Chisholm RD- Hartburg as the point of interconnection, all in Orange County, TX.

1active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3045 Not reported 230 300 Solar Active
J3123 Not reported 230 150 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.