Chanarambie Substation substation interconnection queue

2 active projects totaling 136 MW in the MISO queue, plus 3 with terminal status (shown grayed).

5 MISO queue filings name Chanarambie Substation as the point of interconnection, all in MN.

2active projects
136active MW
5total filed
Queue IDProjectkVMWResourceStatus
G060 Not reported n/r 100 Wind Operational
G491 Not reported n/r 100 Wind Withdrawn
J1498 Not reported 115 50 Battery Withdrawn
G037 Not reported n/r 36 Wind Operational
G688 Not reported n/r 24 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.