Cato Substation substation interconnection queue

1 active project totaling 130 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Cato Substation as the point of interconnection, all in Pike County, IN.

1active projects
130active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1393 Not reported 138 130 Solar Active
J1233 Not reported 138 32.5 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.