Substation Scout

Cash-Newport AB line substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Cash-Newport AB line as the point of interconnection, all in AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2356 Not reported 161 200 Hybrid Withdrawn
J370 Not reported 161 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first