Substation Scout

Carrigan Substation substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Carrigan Substation as the point of interconnection, all in St. Clair County, MI.

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1664 Not reported 120 200 Solar Active
J1665 Not reported 120 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first