Substation Scout

Caneland Substation substation interconnection queue

1 active project totaling 95 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Caneland Substation as the point of interconnection, all in St. Mary Parish, LA.

1active projects
95active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2191 Not reported 230 100 Solar Withdrawn
J1367 Not reported 230 95 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.