Substation Scout

Buffalo Substation substation interconnection queue

3 active projects totaling 1,110 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
1,110active MW
6total filed
Queue IDProjectkVMWResourceStatus
J4105 Not reported 345 500 Hybrid Active
J4106 Not reported 345 500 Hybrid Active
J1428 Not reported 345 200 Solar Withdrawn
J975 Not reported 115 150 Wind Withdrawn
J545 Not reported 115 110 Wind Operational
J816 Not reported 115 60 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first