0 active projects
totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).
4 MISO queue filings name Buffalo Ridge Substation as the point of interconnection, all in MN.
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
H041
Not reported
115
400
Wind
Withdrawn
J958
Not reported
115
100
Wind
Withdrawn
J1001
Not reported
115
40
Solar
Withdrawn
J905
Not reported
115
40
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.