Brookings County Substation substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatus
G765 Not reported 345 240 Gas Withdrawn
G349 Not reported n/r 200 Wind Operational
J575 Not reported 345 100 Wind Withdrawn
G844 Not reported 345 60 Gas Withdrawn
J055 Not reported n/r 40 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.