Substation Scout

Brinkley East - Aubrey Line substation interconnection queue

2 active projects totaling 385 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name Brinkley East - Aubrey Line as the point of interconnection, all in AR.

2active projects
385active MW
3total filed
Queue IDProjectkVMWResourceStatus
J907 Not reported 230 200 Solar Operational
J2237 Not reported 230 185 Solar Active
J2217 Not reported 230 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.