Brewster - Heron Lake Line substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Brewster - Heron Lake Line as the point of interconnection, all in Jackson County, MN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1057
Not reported
161
125
Solar
Withdrawn
J1041
Not reported
161
20
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.