Substation Scout

Boswell substation interconnection queue

1 active project totaling 86.8 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Boswell as the point of interconnection, all in Itasca County, MN.

1active projects
86.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
S1098 Surplus; J1058 230 364.5 Solar Withdrawn
E0011 Boswell Solar Project 230 86.8 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.