BOGALUSA - DEXTER SS (CE) substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name BOGALUSA - DEXTER SS (CE) as the point of interconnection, all in Washington Parish, LA.

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2643 Not reported 115 150 Solar Active
J2642 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.