Blue Lake substation interconnection queue

3 active projects totaling 575.5 MW in the MISO queue.

3 MISO queue filings name Blue Lake as the point of interconnection, all in Scott County, MN.

3active projects
575.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
G369 Not reported 115 385 Gas Operational
R1050 Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4 115 135.5 Hybrid Active
R1051 Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3 115 55 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.